Encoded PAUT & TOFD Volumetric Verification on Live Process Piping Tie-Ins
OIL & GAS • INSPECTION & NDT

Encoded PAUT & TOFD Volumetric Verification on Live Process Piping Tie-Ins

Full encoded PAUT + TOFD volumetric weld examination and MT/VT surface verification across 142 tie-in girth welds replacing radiography inside congested live process blocks.

ASSET & CLIENT CONTEXT

Operational Context

Client Context
Midstream Gas Processing Operator (Anonymized)
Location
Rivers State Industrial Corridor
Asset Type
Carbon Steel High-Pressure Process Piping (8" to 20" NB)

Inspection / Technical Challenge

Executing volumetric code inspection on adjacent live-plant piping tie-ins without triggering plant-wide ionizing radiation exclusion perimeters that would delay simultaneous mechanical trades.

Scope & Execution Approach

Engineered weld-thickness-specific PAUT + TOFD scan plans calibrated on matching reference blocks, capturing 100% digital A/B/C/D-scan data indexed cleanly around every weld circumference alongside complementary MT root/cap checks.

Site & Operational Constraints: Strict live-plant permit-to-work windows, elevated ambient humidity, and congested multi-elevation pipe-rack clearances.

Documented Outcomes

  • Zero radiation exclusion disruptions to concurrent scaffolding, insulation, and mechanical crews.
  • Permanent digital B/C/D-scan archive delivered per weld joint for full engineering audit traceability.
  • Early root-defect characterization enabled targeted localized weld repairs before hydrotest.
Engineering Takeaway

Confirming weld-crown dressing quality and encoder clearance during fit-up eliminates scan delays when PAUT crews arrive.

Field Photography

Encoded PAUT & TOFD Volumetric Verification on Live Process Piping Tie-Ins field photograph 1
Encoded PAUT & TOFD Volumetric Verification on Live Process Piping Tie-Ins field photograph 2
TECHNICAL & COMMERCIAL ENQUIRIES

Planning a Comparable Inspection or Coatings Project?

Share your asset details, applicable engineering codes, and target project window with our technical team to initiate a quotation review.