1. Asset Context

Asset: Shell-and-Tube Cooling Water Heat Exchangers (Carbon Steel Bundles) · Sector: Petrochemicals · Location: Rivers State Petrochemical Zone (Petrochemical Process Complex — Anonymized)

2. Technical Challenge

Recurring minor tube weepage forced premature process unit upsets, but standard hydro-testing only revealed outright through-wall leaks without quantifying near-failure tubes.

3. Scope & Technical Approach

Coordinated early high-pressure hydro-lancing with mechanical maintenance to clear scale deposits, then executed 360-degree water-flooded IRIS ultrasonic scanning across accessible bundle tubes, mapping exact ID/OD remaining wall thickness at baffle zones and inlet ends.

4. Execution Constraints

Tight 72-hour turnaround window between bundle hydro-cleaning, tube inspection, plugging execution, and channel cover box-up.

5. Verified Findings & Client Operational Value

  • Quantified exact internal vs. baffle-wear wall loss percentages across scanned tubes.
  • Identified sub-threshold thinned tubes proactively for preventive plugging alongside leaking tubes.
  • Delivered color-coded tube-sheet baseline maps guiding future bundle replacement procurement.
6. Lessons & Engineering Considerations

Rigorous pre-inspection hydro-blasting verification is essential—any residual hard scale inside tubes creates false echoes or acoustic blockage during IRIS.

TECHNICAL & COMMERCIAL ENQUIRIES

Need Inspection or QA/QC Support?

Share your asset details, applicable engineering codes, and target project window with our technical team to initiate a quotation review.