Technical Dossier & Pre-Audit Readiness
Audits Material Test Certificates (MTC EN 10204 3.1/3.2), calibration logs, WPS/PQR matrices, NDT reports, and pressure-test records against project and code checklists.
- Manufacturing Record Book (MRB) verification prior to equipment shipment
- In-service pressure vessel and piping inspection dossier organization
- Pre-audit gap assessments ahead of client or regulatory visits
- • Fabricated pressure vessels & skids
- • Plant piping & tank registries
- • Lifting asset registers
Electronic or physical project document registers, engineering datasheets, and governing code list.
Document verification depends on original source traceability from mills, labs, and accredited third parties; missing heat traceability requires physical PMI or mechanical verification.
Compliance Gap Matrix, Indexed MRB Review Checklist, and Action Closure Log.
